Vedanta Limited: Production Release for the Second Quarter and Half Year Ended 30th September 2017

MUMBAI, Oct. 10, 2017 /PRNewswire/ --Q2 Highlights

Operations

Zinc India:

    --  Refined zinc-lead metal production at 230kt, up 27% y-o-y
    --  Record refined silver production at 140 tonnes, up 31% y-o-y

Zinc International:

    --  Highest quarterly production of 20kt at Black Mountain in the last 4
        years

Oil & Gas:

    --  Commenced 15-well infill drilling campaign at Mangala; first well
        brought online

Aluminium:

    --  Record quarterly aluminium production
    --  Smelters continue ramp up, with current run-rate of 1.6 mtpa (excluding
        trial run production)

Copper India:

    --  Record quarterly copper cathode production

Iron Ore:

    --  Produced 1.9mt at Karnataka in H1, expect to achieve full allocation
        production during Q3

TSPL:

    --  High plant availability of 87%, following the shutdown in Q1

http://photos.prnewswire.com/prnvar/20150422/740375

Kuldip Kaura, Interim Chief Executive Officer, Vedanta Limted, said: "I feel privileged to take on the helm of a business with Tier 1 assets and I am very excited to be here. During the quarter, our Zinc, Copper India and Aluminium businesses have delivered a strong production performance. We have also commenced our growth journey on both the exploration and development front in our Oil & Gas business. We are continuing to realise operational efficiencies across our diversified portfolio and to benefit from a supportive market environment."


    Oil & Gas
    ---------

                                     Q2            Q1         H1
                         ---            ---            ---

    Particulars          FY2018         FY2017             %       FY2018        %    FY2018    FY2017       %

                                                       change                change                       change

                                                         YoY                  QoQ                          YoY
    ---                                                ---                   ---                          ---

    OIL AND  GAS
    ------------

    Average Daily
     Total Gross                190,389        206,230        (8)%   196,656      (3)%   193,505    206,342      (6)%

    Operated
     Production
     (boepd) (1)
    ------------

    Average Daily
     Gross Operated             180,955        196,399        (8)%   187,203      (3)%   184,062    196,629      (6)%

    Production
     (boepd)
    ----------

       Rajasthan                153,238        167,699        (9)%   159,351      (4)%   156,278    167,323      (7)%
       ---------                -------        -------         ---    -------       ---    -------    -------       ---

       Ravva                     17,266         18,823        (8)%    18,361      (6)%    17,810     19,228      (7)%
       -----                     ------         ------         ---     ------       ---     ------     ------       ---

       Cambay                    10,452          9,877          6%     9,491       10%     9,974     10,078      (1)%
       ------                    ------          -----         ---      -----       ---      -----     ------       ---

    Average Daily
     Working                    115,332        125,575        (8)%   119,473      (3)%   117,391    125,484      (6)%

    Interest
     Production
     (boepd)
    -----------

       Rajasthan                107,267        117,390        (9)%   111,546      (4)%   109,395    117,126      (7)%
       ---------                -------        -------         ---    -------       ---    -------    -------       ---

       Ravva                      3,885          4,235        (8)%     4,131      (6)%     4,007      4,326      (7)%
       -----                      -----          -----         ---      -----       ---      -----      -----       ---

       Cambay                     4,181          3,951          6%     3,796       10%     3,990      4,031      (1)%
       ------                     -----          -----         ---      -----       ---      -----      -----       ---

    Total Oil and Gas
     (million boe)
    -----------------

       Oil & Gas- Gross            16.6           18.1        (8)%      17.0      (2)%      33.7       36.0      (6)%
       ----------------            ----           ----         ---       ----       ---       ----       ----       ---

       Oil & Gas-
        Working Interest           10.6           11.6        (8)%      10.9      (2)%      21.5       23.0      (6)%
       -----------------           ----           ----         ---       ----       ---       ----       ----       ---

Q2 FY 2018 vs. previous quarters

Average gross production during Q2 FY2018 was 180,955 barrels of oil equivalent per day (boepd), 3% lower q-o-q and 8% lower y-o-y on account of natural decline in producing reservoirs, partially offset by continued reservoir management practices, strong Enhanced Oil Recovery (EOR) performance and production optimization activities.

Gross production from the Rajasthan block averaged 153,238 boepd for the quarter, 4% lower q-o-q primarily due to natural decline and temporary shutdown of satellite fields owing to operational issues. These satellite fields are being brought online in a phased manner. Gross production from Development Area-1 (DA-1), Development Area-2 (DA-2) and Development Area-3 (DA-3) averaged 137,562 boepd, 15,606 boepd and 70 boepd, respectively

Gas production from Raageshwari Deep Gas (RDG) averaged 33.8 million standard cubic feet per day (mmscfd) in Q2 FY2018, with gas sales, post captive consumption, at 18.0 mmscfd (production of 35.4 mmscfd and sales of 20.4 mmscfd in Q1).

The Ravva block produced at an average rate of 17,266 boepd for the quarter. Closing of the water producing zones in two wells and gas lift optimization has helped in enhancing production rates from the field, partially offsetting the natural decline.

The Cambay block produced at an average rate of 10,452 boepd for the quarter. Targeting incremental production opportunities, a gas well has been re-activated and gas lift started in two wells which has helped offset the natural decline.

Drilling of 15 infill wells at the Mangala field has commenced during Q2 and the first well was brought online at the end of September. Aishwariya Barmer Hill (ABH) Phase-I has been approved and the production from existing wells has commenced during the quarter. Additional growth projects like Bhagyam EOR, Aishwariya EOR, ABH Phase-II, Liquid handling upgrade and the field development plan for 45 additional infill wells at Mangala are under advanced stages of discussion with our JV partner for approval.

Post completion of RDG Phase-I in November 2017, gas production is expected to increase to 40-45 mmscfd. Tendering activity for partnership with leading service providers for integrated delivery of RDG Phase-II is progressing well and is expected to increase the gas production to over 100 mmscfd, and condensate production to over 5 kboepd by H1 CY2019.

H1 FY2018 vs. H1 FY2017

Average gross production across our assets was at 184,062 boepd. Production from Rajasthan was 156,278 boepd, 7% lower y-o-y on account of natural decline in the producing reservoirs, partially offset by positive results from the Mangala EOR and other reservoir management practices. RDG gas production has increased from an average of 30.4 mmscfd in H1 FY2017 to 34.6 mmscfd in H1 FY2018. Production from the offshore assets - Ravva and Cambay, was at a combined 27,784 boepd, lower by c.5% y-o-y, due to natural decline.


    Zinc India


    Particulars (In
     '000 tonnes, or
     as                       Q2         Q1          H1

    stated)
    ------

    FY2018            FY2017       %         FY2018          %     FY2018   FY2017     %

                                 change                   change                     change

                                 YoY                       QoQ                        YoY
    ---                          ---                      ---                        ---

    Zinc India(kt)
    -------------

       Mined metal
        content              219         192          14%      233      (6)%      452       318    42%
       -----------           ---         ---          ---       ---       ---       ---       ---    ---

       Refined Zinc -
        Total                192         150          28%      194      (1)%      386       252    53%
       --------------        ---         ---          ---       ---       ---       ---       ---    ---

       Refined Zinc -
        Integrated           192         149          29%      194      (1)%      386       250    54%
       --------------        ---         ---          ---       ---       ---       ---       ---    ---

       Refined Zinc -
        Custom                 -          1            -        -        -        -        2      -
       --------------        ---        ---          ---      ---      ---      ---      ---    ---

       Refined Lead -
        Total 2               38          31          24%       35        9%       73        55    32%
       --------------        ---         ---          ---       ---       ---       ---       ---    ---

       Refined Lead -
        Integrated            38          31          24%       35        9%       73        55    32%
       --------------        ---         ---          ---       ---       ---       ---       ---    ---

       Refined Lead -
        Custom                 -          -                    -                          -
       --------------        ---        ---                  ---                        ---

      Silver -Total
       (in tonnes) 3         140         107          31%      115       22%      255       196    30%
      --------------         ---         ---          ---       ---       ---       ---       ---    ---

      Silver-
       Integrated (in
       tonnes)               140         107          31%      115       22%      255       196    30%
      ---------------        ---         ---          ---       ---       ---       ---       ---    ---

      Silver- Custom
       (in tonnes)             -          -           -        -        -        -        -     -
      --------------         ---        ---         ---      ---      ---      ---      ---   ---

Q2 FY 2018 vs. previous quarters

Mined metal production was at 219,000 tonnes, 14% higher y-o-y, on account of higher volumes from underground mines. Q-o-Q production declined by 6% due to lower ore treatment.

Integrated zinc metal production was 192,000 tonnes, 29% higher y-o-y and flat sequentially. Integrated lead metal production was 38,000 tonnes, 24% higher y-o-y and 9% higher q-o-q. This was in line with availability of mined metal and smelters.

Integrated silver production was at a record high of 140 tonnes, up 31% y-o-y and 22% q-o-q in line with higher lead production.

Capital mine development of 9,765 meters was achieved across all mines during the quarter, up 77% y-o-y and 11% sequentially. Rampura Agucha underground mine development is progressing well and the main production shaft is on track for commissioning in Q3 FY 2019. Shaft project at Sindesar Khurd is also on track for commissioning in Q2 FY 2019 while construction work for a new third mill of 1.5 mtpa capacity commenced during the quarter. Zawar mill debottlenecking was completed and the upgraded capacity of 2.7 mtpa was commissioned during the quarter.

H1 FY2018 vs. H1 FY2017

Mined metal production was at 452,000 tonnes in H1 FY2018, 42% higher y-o-y driven by higher ore production across all mines.

Integrated zinc, lead and silver production were higher by 54% y-o-y, 32% y-o-y and 30% y-o-y respectively, in line with availability of mined metal.


    Zinc International


    Particulars (In
     '000 tonnes, or as            Q2        Q1         H1

    stated)
    ------

    FY2018                 FY2017       %        FY2018        %      FY2018   FY2017     %

                                      change                 change                     change

                                       YoY                    QoQ                        YoY
    ---                               ---                    ---                        ---

    Zinc International             42         39         13%       32       33%       74       82    (9)%
    ------------------            ---        ---         ---       ---       ---       ---      ---     ---

       Zinc refined -
        Skorpion                   23         23          0%       14       66%       36       47   (22)%
       --------------             ---        ---         ---       ---       ---       ---      ---    ----

       Mined metal content
        -BMM                       20         16         23%       18        8%       38       35      8%
       -------------------        ---        ---         ---       ---       ---       ---      ---     ---

Q2 FY2018 vs. previous quarters

Total production increased to 42,000 tonnes, 33% higher q-o-q and 13% y-o-y. Skorpion production increased to 23,000 tonnes, 66% higher q-o-q. This is on the back of a successful planned refinery shut down in Q1 which has resulted in restoring the acid plant to full capacity. BMM production increased to 20,000 tonnes, 8% higher q-o-q and 23% y-o-y. The increase was on account of better grades from improved drilling accuracy and higher recoveries due to operational efficiencies.

At Gamsberg, pre-stripping is progressing well, and we have achieved full ramp up of pre-stripping mining volumes of 3.5 million tons per month. To date, we have excavated over 32 million tonnes of waste rock of the total 65-70 million tons of pre-stripping required.

At Skorpion, the pit 112 extension project is progressing well and most of the equipment is in place. Waste mining that started in April 2017 has been at record levels in Q2.

H1 FY2018 vs. H1 FY2017

During H1 FY2018, total production decreased to 74,000 tonnes, 9% lower y-o-y on account of a planned shutdown of the acid plant at Skorpion during Q1 FY2018, partly offset by higher grades and higher recoveries at BMM.


    Iron Ore


                                   Q2        Q1            H1
                           ---        ---           ---

    Particulars (in
     million dry
     metric                FY2018     FY2017           %          FY2018       %         FY2018    FY2017     %

    tonnes, or as
     stated)                                        change                   change                         change

                                                     YoY                      QoQ                            YoY
    ---                                             ---                      ---                            ---

                  IRON ORE
                  --------

    Sales                         0.7           0.8          (7)%        2.3        (67)%       3.0       3.4      (12)%
    -----                         ---           ---           ---         ---         ----        ---       ---       ----

         Goa                      0.1           0.3         (59)%        1.9        (93)%       2.0       2.4      (18)%
         ---                      ---           ---          ----         ---         ----        ---       ---       ----

         Karnataka                0.6           0.5           30%        0.4          43%       1.0       1.0         3%
         ---------                ---           ---           ---         ---          ---        ---       ---        ---

    Production of
     Saleable Ore                 1.2           1.5         (14)%        3.2        (62)%       4.5       4.7       (4)%
    -------------                 ---           ---          ----         ---         ----        ---       ---        ---

         Goa                      0.4           0.5         (25)%        2.2        (82)%       2.6       2.9      (12)%
         ---                      ---           ---          ----         ---         ----        ---       ---       ----

         Karnataka                0.9           0.9          (8)%        1.1        (22)%       1.9       1.7        11%
         ---------                ---           ---           ---         ---         ----        ---       ---        ---

    Production ('000
     tonnes)
    ----------------

         Pig Iron                 137           192         (29)%        163        (16)%       300       370      (19)%
         --------                 ---           ---          ----         ---         ----        ---       ---       ----

Q2 FY2018 vs. previous quarters

At Goa, production was 0.4 million tonnes, with mining activities being lower in Q2, due to the monsoon season. We sold a lower quantity of ore at 0.1 million tonnes due to the low pricing environment.

At Karnataka, we are close to achieving our annual mining cap with production of 0.9 million tonnes during the quarter. Sales were 0.6 million tonnes during the quarter, 30% higher y-o-y and 43% higher q-o-q.

We have inventory of around 3 million tonnes at Goa and 1.2 million tonnes at Karnataka which will be sold in coming quarters.

We remain engaged with respective state governments for mining capacity increases.

Pig Iron production decreased to 137,000 tonnes, 29% lower y-o-y and 16% lower q-o-q due to a local contractors' strike. This strike has been resolved in mid-September 2017 and production will pick up in coming quarters.

H1 FY2018 vs. H1 FY2017

Production from Goa was 2.6 million tonnes and sales were 2.0 million tonnes, compared to 2.9 million tonnes and 2.4 million tonnes respectively. Production and sales at Goa were impacted by the low pricing environment. At Karnataka, both production and sales were higher y-o-y at 1.9 million tonnes and 1.0 million tonnes respectively. Production of Pig Iron decreased to 300,000 tonnes in H1 FY2018, 19% lower mainly due to lower metallurgical coke availability on account of weather related supply disruptions in Australia in Q1 FY2018 and local contractors' strike in Q2 FY2018. Pig iron production is expected to pick up in the coming quarters.


    Copper - India


                              Q2        Q1             H1
                      ---        ---           ---

    Particulars
     (in'000 tonnes,
     or as            FY2018     FY2017         %           FY2018    %           FY2018    FY2017    %

    stated)                                    change                 change                         change

                                               YoY                    QoQ                            YoY
    ---                                        ---                    ---                            ---

    COPPER- INDIA
    -------------

      Copper -
       Cathodes              106            97           9%        90          17%       197       198       (1)%
      ---------              ---           ---          ---        ---          ---        ---       ---        ---

      Tuticorin Power
       Sales (MU)              4            30        (86)%        30        (91)%        34        90      (62)%
      ---------------        ---           ---         ----        ---         ----        ---       ---       ----

Q2 FY 2017 vs. previous quarters

Production from the Tuticorin smelter was a record at 106,000 tonnes of cathodes, 9% higher y-o-y and 17% higher q-o-q due to improved operational efficiencies.

The 160 MW power plant at Tuticorin operated at a lower Plant Load Factor (PLF) of 43% during Q2 FY2018 (PLF of 48% in Q1 FY2018 and 48% in Q1 FY2017). We are looking to enter into a power purchase agreement to ensure higher PLFs and will continue to explore viable supply agreement options.

H1 FY2018 vs. H1 FY2017

Production in H1 FY2018 was 197,000 tonnes of cathodes, similar to H1 FY2017. The 160MW power plant at the Tuticorin operated at a PLF of 45% in H1 FY2018 compared to 54% in H1 FY2017, primarily due to lower demand.


    Aluminium


                                                                                                                                            Q2        Q1                H1
                                                                                                                                    ---        ---             ---

    Particulars(in'000 tonnes, or as                                                                                                FY2018     FY2017             %          FY2018          %          FY2018       FY2017         %

    stated)                                                                                                                                                     change                     change                                  change

                                                                                                                                                              YoY                        QoQ                                     YoY
    ---                                                                                                                                                  ---                        ---                                     ---

    Aluminium
    ---------

    Alumina-Lanjigarh                                                                                                                      269            292           (8)%          303          (11)%          572           567             1%
    -----------------                                                                                                                      ---            ---            ---           ---           ----           ---           ---            ---

    Total Aluminium Production                                                                                                             401            296            36%          352            14%          753           541            39%
    --------------------------                                                                                                             ---            ---            ---           ---            ---           ---           ---            ---

         Jharsuguda-I                                                                                                                       99            132          (25)%           92             7%          191           261          (27)%
         ------------                                                                                                                      ---            ---           ----           ---            ---           ---           ---           ----

         Jharsuguda-II 4                                                                                                                   157             48              -          120            31%          277            77              -
         ---------------                                                                                                                   ---            ---            ---          ---            ---           ---           ---            ---

         Korba-I                                                                                                                            65             63             4%           63             4%          128           126             2%
         -------                                                                                                                           ---            ---            ---           ---            ---           ---           ---            ---

         Korba-II 5                                                                                                                         79             52            51%           77             3%          156            77              -
         ----------                                                                                                                        ---            ---            ---           ---            ---           ---           ---            ---

         Balco 270 MW *                                                                                                                      -             -             -            -             -            -            -             -
         -------------                                                                                                                     ---           ---           ---          ---           ---          ---          ---           ---

    Jharsuguda 1800 MW (Surplus Power Sales in Million Units) *                                                                              -           156              -            -             -            -          511              -
    ----------------------------------------------------------                                                                             ---           ---            ---          ---           ---          ---          ---            ---

    * Jharsuguda 1,800MW and BALCO 270 MW power plants have been moved from the Power to the Aluminium segment from 1st April 2016.

Q2 FY2018 vs. previous quarters

During Q2 FY2018, aluminium production increased to 401,000 tonnes (i.e. production including trial run), 36% y-o-y and 14% q-o-q. The increase was driven by ramp ups at the Jharsuguda II smelter and complete ramp up of the Balco II smelter in Q1 FY 2018.

At Jharsuguda I, out of the total 228 pots which were affected in the April 2017 outage, 121 pots are operational to date, and the balance will be operational by Q3 FY2018. At Jharsuguda II, out of four lines, ramp-up of line-2 was completed in Q4 FY2017; the ramp-up of line-1 and line-3 are progressing well with 301 pots and 156 pots operational, respectively, at the end of the quarter. These lines will be fully operational by Q3 FY2018. Line-4 continues to be under evaluation.

At the end of August, there was a breach in the ash pond dyke wall at Jharsuguda plant following which the State Pollution Control Board, Odisha (SPCB), directed a temporary closure of five units on September 13th 2017. Subsequently on September 20th, the SPCB revoked the closure of three of these units except one unit of 135 MW of the 1,215 MW and one unit of 600MW of the 2,400 MW. The Company was required to purchase some external power during the interim seven day period which will have an impact on the cost of production for the quarter.

The demand-supply imbalance on domestic coal supplies resulted in increase of coal prices and caused continuing disruptions in domestic coal availability for the captive power plants during the quarter.

Alumina production was 269,000 tonnes, 8% lower y-o-y and 11% lower q-o-q. During the quarter, production was adversely impacted by lower bauxite availability from our mines at Chhattisgarh due to transport bottlenecks.

The exit monthly run rate of aluminium production was 1.6 million tonnes per annum (mtpa, excluding trial run production) in September 2017.

We expect to produce c. 1.5 to 1.6 mtpa of aluminium (excluding trial run production) in FY2018.

H1 FY2018 vs. H1 FY2017

Aluminium production increased to 753,000 tonnes in H1 FY2018, 39% higher y-o-y, mainly on account of the ramp up of additional pots at Jharsuguda II and Balco II. Alumina production was 572,000 tonnes, 1% higher y-o-y due to lower bauxite dispatches.


    Power
    -----


                                       Q2                       Q1                       H1
                                       ---                      ---                      ---

    Particulars (in
     millin units)                     FY2018                   FY2017                   % change              FY2018       % change      FY2018       FY2017       % change

                                                                                        YoY                                QoQ                                     YoY
    ---                                                                            ---                                ---                                     ---   ----

    Power
    -----

    Total Power
     Sales                                              2,950                     3,030                   (3)%        1,838            61%        4,787         6,039         (21)%
    -----------                                         -----                     -----                    ---         -----            ---         -----         -----          ----

       Jharsuguda 600
        MW                                                 93                       605                  (85)%          564          (84)%          657         1,497         (56)%
       --------------                                     ---                       ---                   ----           ---           ----           ---         -----          ----

       Balco 600 MW                                       132                       549                  (76)%          551          (76)%          682         1,156         (41)%
       ------------                                       ---                       ---                   ----           ---           ----           ---         -----          ----

       MALCO*                                               0                        25                      -            4              -            4           115         (97)%
       -----                                              ---                       ---                    ---          ---            ---          ---           ---          ----

       HZL Wind Power                                     143                       172                  (17)%          156           (8)%          299           320          (7)%
       --------------                                     ---                       ---                   ----           ---            ---           ---           ---           ---

       TSPL                                             2,582                     1,679                    54%          563              -        3,145         2,951            7%
       ----                                             -----                     -----                    ---           ---            ---        -----         -----           ---

       TSPL -
        Availability                                      87%                      77%                     -          20%             -          54%          75%            -
       -------------                                      ---                       ---                    ---          ---            ---          ---           ---           ---

    * Continues to be under care and maintenance as of 26th May 2017 due to low demand in Southern India

Q2 FY2018 vs. previous quarters

During Q2 FY2018, power sales were 2,950 million units (mu), 3% lower y-o-y and 61% higher q-o-q. This was primarily on account of restart of the TSPL plant at the end of June 2017, following the shutdown for around 65 days in Q1 FY2018 due to a fire in April 2017.

During the quarter, TSPL power sales were 2,582 million units with 87% availability compared to 20% in Q1 FY2018. The Power Purchase Agreement with the Punjab State Electricity Board (PSEB) compensates us based on the availability of the plant. We are targeting an average availability of over 70% for the full year.

The 600MW Jharsuguda power plant operated at a Plant Load Factor (PLF) of 7% in Q2 FY2018 (PLF of 47% in Q1 FY2018, 50% in Q2 FY2017). Power Sales were heavily impacted due to the Ash Dyke breach issue and a temporary coal shortage.

The 600 MW BALCO IPP (2X300MW) operated at a PLF of 31% in Q1 FY2018 compared to 68% Q1 FY2018 (Q2 FY2017: 54%) on account of temporary coal shortage.

H1 FY2018 vs. H1 FY2017

During H1 FY2018, power sales decreased to 4,787 million units, 21% lower y-o-y mainly due to a temporary coal shortage.


    Production Summary (Unaudited)



                                                                            (In '000 tonnes, except as stated)

    Particulars                                          Q2                         Q1                               H1
    -----------                     ---                             ---                       ---

                    FY                  FY         %        FY            %          FY          FY             %
                   2018                   2017 Change YoY     2018    Change QoQ        2018          2017    Change  YoY
                   ----                   ---- ----------     ----    ----------        ----          ----    -----------

    OIL AND GAS
    -----------

    Average Daily Total
     Gross Operated                    190,389    206,230      (8)%      196,656         (3)%      193,505        206,342       (6)%

    Production  (boepd)(1)
    ---------------------                                                                                                   ---

    Average Daily Gross
     Operated                          180,955    196,399      (8)%      187,203         (3)%      184,062        196,629       (6)%

    Production (boepd)
    -----------------                                                                                                       ---

       Rajasthan                       153,238    167,699      (9)%      159,351         (4)%      156,278        167,323       (7)%
       ---------                       -------    -------       ---       -------          ---       -------        -------        ---

       Ravva                            17,266     18,823      (8)%       18,361         (6)%       17,810         19,228       (7)%
       -----                            ------     ------       ---        ------          ---        ------         ------        ---

       Cambay                           10,452      9,877        6%        9,491          10%        9,974         10,078       (1)%
       ------                           ------      -----       ---         -----          ---         -----         ------        ---

    Average Daily
     Working Interest
     Production (boepd)                115,332    125,575      (8)%      119,473         (3)%      117,391        125,484       (6)%
    -------------------                -------    -------       ---       -------          ---       -------        -------        ---

       Rajasthan                       107,267    117,390      (9)%      111,546         (4)%      109,395        117,126       (7)%
       ---------                       -------    -------       ---       -------          ---       -------        -------        ---

       Ravva                             3,885      4,235      (8)%        4,131         (6)%        4,007          4,326       (7)%
       -----                             -----      -----       ---         -----          ---         -----          -----        ---

       Cambay                            4,181      3,951        6%        3,796          10%        3,990          4,031       (1)%
       ------                            -----      -----       ---         -----          ---         -----          -----        ---

    Total Oil and Gas (million boe)
    ------------------------------

       Oil & Gas- Gross                   16.6       18.1      (8)%         17.0         (2)%         33.7           36.0       (6)%
       ----------------                   ----       ----       ---          ----          ---          ----           ----        ---

       Oil & Gas-Working
        Interest                          10.6       11.6      (8)%         10.9         (2)%         21.5           23.0       (6)%
       -----------------                  ----       ----       ---          ----          ---          ----           ----        ---

    Zinc India
    ----------

       Mined metal content                 219        192       14%          233         (6)%          452            318        42%
       -------------------                 ---        ---       ---           ---          ---           ---            ---        ---

       Refined Zinc -
        Total                              192        150       28%          194           1%          386            252        53%
       --------------                      ---        ---       ---           ---          ---           ---            ---        ---

       Refined Zinc -
        Integrated                         192        149       29%          194         (1)%          386            250        54%
       --------------                      ---        ---       ---           ---          ---           ---            ---        ---

       Refined Zinc -
        Custom                               -         1         -            -           -            -             2          -
       --------------                      ---       ---       ---          ---         ---          ---           ---        ---

       Refined Lead -
        Total (2)                           38         31       24%           35           9%           73             55        32%
       --------------                      ---        ---       ---           ---          ---           ---            ---        ---

       Refined Lead -
        Integrated                          38         31       24%           35           9%           73             55        32%
       --------------                      ---        ---       ---           ---          ---           ---            ---        ---

       Refined Lead -
        Custom                               -         -                     -                                      -
       --------------                      ---       ---                   ---                                    ---

      Silver -Total  (in
       tonnes) 3                           140        107       31%          115          22%          255            196        30%
      ------------------                   ---        ---       ---           ---          ---           ---            ---        ---

      Silver- Integrated
       (in tonnes)                         140        107       31%          115          22%          255            196        30%
      ------------------                   ---        ---       ---           ---          ---           ---            ---        ---

      Silver- Custom (in
       tonnes)                               -         -        -            -           -            -             -         -
      ------------------                   ---       ---      ---          ---         ---          ---           ---       ---

    Zinc International                      42         39       13%           32          33%           74             82       (9)%
    ------------------                     ---        ---       ---           ---          ---           ---            ---        ---

    Zinc -Refined
     -Skorpion                              23         23        0%           14          66%           36             47      (22)%
    -------------                          ---        ---       ---           ---          ---           ---            ---       ----

    Mined metal content
     -BMM                                   20         16       23%           18           8%           38             35         8%
    -------------------                    ---        ---       ---           ---          ---           ---            ---        ---

    IRON ORE (in million dry metric

    tonnes, or as stated)
    --------------------

    Sales                                  0.7        0.8      (7)%          2.3        (67)%          3.0            3.4      (12)%
    -----                                  ---        ---       ---           ---         ----           ---            ---       ----

         Goa                               0.1        0.3     (59)%          1.9        (93)%          2.0            2.4      (18)%
         ---                               ---        ---      ----           ---         ----           ---            ---       ----

         Karnataka                         0.6        0.5       30%          0.4          43%          1.0            1.0         3%
         ---------                         ---        ---       ---           ---          ---           ---            ---        ---

    Production of
     Saleable Ore                          1.2        1.5     (14)%          3.2        (62)%          4.5            4.7       (4)%
    -------------                          ---        ---      ----           ---         ----           ---            ---        ---

         Goa                               0.4        0.5     (25)%          2.2        (82)%          2.6            2.9      (12)%
         ---                               ---        ---      ----           ---         ----           ---            ---       ----

         Karnataka                         0.9        0.9      (8)%          1.1        (22)%          1.9            1.7        11%
         ---------                         ---        ---       ---           ---         ----           ---            ---        ---

    Production ('000, tonnes)
    ------------------------

         Pig Iron                          137        192     (29)%          163        (16)%          300            370      (19)%
         --------                          ---        ---      ----           ---         ----           ---            ---       ----


                                                   Q2                       Q1                       H1
                                                   ---                     ---                      ---

    Particulars                                    FY                       FY                       %                        FY                        %                        FY                       FY            %
                                                           2018                     2017             Change                             2018             Change                             2018                2017      Change
                                                                                                     YoY                                                QoQ                                                             YoY
    ---                                                                             ---                                                ---                                                                   ---       ---

    COPPER - INDIA
    --------------

      Copper - Cathodes                                     106                       97                         9%                       90                        17%                      197                 198                 (1)%
      -----------------                                     ---                      ---                        ---                       ---                        ---                       ---                 ---                  ---

      Tuticorin Power
       Plant Sales (MU)                                       4                       30                      (86)%                       30                      (91)%                       34                  90                (62)%
      -----------------                                     ---                      ---                       ----                       ---                       ----                       ---                 ---                 ----

    ALUMINUM
    --------

    Alumina-Lanjigarh                                       269                      292                       (8)%                      303                      (11)%                      572                 567                   1%
    -----------------                                       ---                      ---                        ---                       ---                       ----                       ---                 ---                  ---

    Total Aluminum
     Production                                             401                      296                        36%                      352                        14%                      753                 541                  39%
    --------------                                          ---                      ---                        ---                       ---                        ---                       ---                 ---                  ---

         Jharsuguda-I                                        99                      132                      (25)%                       92                         7%                      191                 261                (27)%
         ------------                                       ---                      ---                       ----                       ---                        ---                       ---                 ---                 ----

         Jharsuguda-II4                                     157                       48                          -                      120                        31%                      277                  77                    -
         --------------                                     ---                      ---                        ---                      ---                        ---                       ---                 ---                  ---

         Korba-I                                             65                       63                         4%                       63                         4%                      128                 126                   2%
         -------                                            ---                      ---                        ---                       ---                        ---                       ---                 ---                  ---

         Korba-II5                                           79                       52                        51%                       77                         3%                      156                  77                    -
         ---------                                          ---                      ---                        ---                       ---                        ---                       ---                 ---                  ---

       Balco 270 MW                                           -                       -                         -                        -                         -                        -                  -                   -
       ------------                                         ---                     ---                       ---                      ---                       ---                      ---                ---                 ---

    Jhasrsuguda 1800
     MW (Surplus Power
     Sales)                                                   -                     156                          -                        -                         -                        -                511                    -
    ------------------                                      ---                     ---                        ---                      ---                       ---                      ---                ---                  ---

    POWER (in million units)
    -----------------------

    Total Power Sales                                     2,950                    3,030                       (3)%                    1,838                        61%                    4,787               6,039                (21)%
    -----------------                                     -----                    -----                        ---                     -----                        ---                     -----               -----                 ----

       Jharsuguda 600 MW                                     93                      605                      (85)%                      564                      (84)%                      657               1,497                (56)%
       -----------------                                    ---                      ---                       ----                       ---                       ----                       ---               -----                 ----

       Balco 600 MW                                         132                      549                      (76)%                      551                      (76)%                      682               1,156                (41)%
       ------------                                         ---                      ---                       ----                       ---                       ----                       ---               -----                 ----

       MALCO*                                                 0                       25                          -                        4                          -                        4                 115                (97)%
       -----                                                ---                      ---                        ---                      ---                        ---                      ---                 ---                 ----

       HZL Wind Power                                       143                      172                      (17)%                      156                       (8)%                      299                 320                 (7)%
       --------------                                       ---                      ---                       ----                       ---                        ---                       ---                 ---                  ---

       TSPL                                               2,582                    1,679                        54%                      563                          -                    3,145               2,951                   7%
       ----                                               -----                    -----                        ---                       ---                        ---                    -----               -----                  ---

       TSPL -
        Availability                                        87%                     77%                         -                      20%                         -                      54%                75%                   -
       -------------                                        ---                      ---                        ---                      ---                        ---                      ---                 ---                  ---

    Ports - VGCB (in million tonnes)6
    ---------------------------------

    Cargo Discharge                                         1.1                      1.3                      (15)%                      1.2                      (12)%                      2.3                 2.9                (19)%
    ---------------                                         ---                      ---                       ----                       ---                       ----                       ---                 ---                 ----

    Cargo Dispatches                                        1.2                      1.5                      (24)%                      1.1                      (11)%                      2.3                 3.0                (26)%
    ----------------                                        ---                      ---                       ----                       ---                       ----                       ---                 ---                 ----

    * Continues to be under care and maintenance as of 26th May 2017 due to low demand in Southern India


    1. Including Internal Gas consumption

    2. Excluding Captive consumption of 1,634 tonnes in Q2 FY 2018 vs 837 tonnes in Q2 FY 2017 and 1,956 tonnes in Q1 FY2018 with 3,590 tonnes in H1 FY 2018 vs 1,921 tonnes in H1 FY 2017

    3. Excluding captive consumption of 8.8 tonnes in Q2 FY2018 as compared with 4.3 tonnes in corresponding prior period and 10.2 tonnes in previous quarter. For H1, it was 19.0 tonnes as compared with
     9.8 tonnes a year ago.

    4. Including trial run production of 15 kt in Q2 FY 2018 vs 19 kt in Q2 FY 2017 and 19kt in Q1 FY 2018 and 34 kt in H1 FY2018 vs 29 kt in H1 FY 2017

    5. Including trial run production of 1 kt in Q2 FY2018 vs 22 kt in Q2 FY2017 and 15 kt in Q1 FY 2018 and and 16 kt in H1 FY 2018 vs 28 kt in H1 FY 2017

    6. Vizag General Cargo Berth

For further information, please contact:

Communications
Arun Arora
Head, Corporate Communications
Tel: +91-124-459-3000
gc@vedanta.co.in

Investor Relations
Ashwin Bajaj

Director - Investor Relations
Tel: +91-22-6646-1531
vedantaltd.ir@vedanta.co.in

Aarti Raghavan
VP - Investor Relations

Sneha Tulsyan
Associate Manager - Investor Relations

About Vedanta Limited

Vedanta Limited is a diversified natural resources company, whose business primarily involves producing oil & gas, zinc - lead - silver, copper, iron ore, aluminium and commercial power. The company has a presence across India, South Africa, Namibia, Australia and Ireland.

Vedanta Limited is the Indian subsidiary of Vedanta Resources Plc, a London-listed company. Governance and Sustainable Development are at the core of Vedanta's strategy, with a strong focus on health, safety and environment and on enhancing the lives of local communities. The company is conferred with the Confederation of Indian Industry (CII) 'Sustainable Plus Platinum label', ranking among the top 10 most sustainable companies in India. To access the Vedanta Sustainable Development Report 2017, please visit http://sd.vedantaresources.com/SustainableDevelopment2016-17/

Vedanta Limited is listed on the Bombay Stock Exchange and the National Stock Exchange in India and has ADRs listed on the New York Stock Exchange.

For more information please visit www.vedantalimited.com

Vedanta Limited
Vedanta, 75, Nehru Road,
Vile Parle (East), Mumbai - 400 099
www.vedantalimited.com

Registered Office:
Regd. Office: 1st Floor, 'C' wing, Unit 103,
Corporate Avenue, Atul Projects,
Chakala, Andheri (East),
Mumbai - 400 093
CIN: L13209MH1965PLC291394

Disclaimer

This press release contains "forward-looking statements" - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as "expects," "anticipates," "intends," "plans," "believes," "seeks," "should" or "will." Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements. We do not undertake to update our forward-looking statements.

View original content:http://www.prnewswire.com/news-releases/vedanta-limited-production-release-for-the-second-quarter-and-half-year-ended-30th-september-2017-300533760.html

SOURCE Vedanta Limited