VIDEO RELEASE--Huntington Ingalls Industries Reaches 50 Percent Completion in Construction of Future Aircraft Carrier John F. Kennedy (CVN 79)

NEWPORT NEWS, Va., Aug. 31, 2018 (GLOBE NEWSWIRE) -- Huntington Ingalls Industries’ (NYSE:HII) Newport News Shipbuilding division reached the midpoint in the construction of the nuclear-powered aircraft carrier John F. Kennedy (CVN 79) following the installation of one of the largest units on the ship.

Weighing approximately 905 metric tons, the unit is one of the heaviest of the planned steel structures, known as superlifts, that will be joined together to make up the second ship in the Gerald R. Ford class. The superlift of the aft section of the ship between the hangar bay and flight deck is 80 feet long, about 110 feet wide and four decks in height.

Combining 19 smaller units into one superlift allowed Newport News to install a majority of the outfitting equipment—grating, pumps, valves, pipe, electrical panels, mounting studs, lighting, ventilation and other components—before the structure was hoisted into the dry dock using the shipyard’s 1,050-metric ton gantry crane. This approach resulted in this work being completed 14 months earlier than it was on Ford, said Lucas Hicks, Newport News’ vice president, CVN 79 program.

“This was a game changer for us,” Hicks said. “Performing higher levels of pre-outfitting represents a significant improvement in aircraft carrier construction, allowing us to build larger structures than ever before and providing greater cost savings.”

A video and photos accompanying this release are available at: https://newsroom.huntingtoningalls.com/releases/cvn-79-game-changing-superlift.

“This superlift represents the future build strategy for Ford-class carriers,” said Mike Butler, program director of CVN 79. “Not only did we build this superlift larger and with significantly more pre-outfitting, we managed much of the work on the deckplate with new digital project management tools as part of our Integrated Digital Shipbuilding initiative. The lessons we learned from this successful superlift will allow us to build even more similar superlifts on future ships in the Ford class.”

Kennedy is scheduled to move from the dry dock to an outfitting berth in the fourth quarter of 2019, three months ahead of schedule.

Huntington Ingalls Industries is America’s largest military shipbuilding company and a provider of professional services to partners in government and industry. For more than a century, HII’s Newport News and Ingalls shipbuilding divisions in Virginia and Mississippi have built more ships in more ship classes than any other U.S. naval shipbuilder. HII’s Technical Solutions division provides a wide range of professional services through its Fleet Support, Integrated Missions Solutions, Nuclear & Environmental, and Oil & Gas groups. Headquartered in Newport News, Virginia, HII employs more than 39,000 people operating both domestically and internationally. For more information, visit:

Contact:

Duane Bourne
Duane.A.Bourne@HII-co.com
(757) 380-3581

View source version on GlobeNewswire: http://globenewswire.com/news-release/2018/08/31/1564043/0/en/VIDEO-RELEASE-Huntington-Ingalls-Industries-Reaches-50-Percent-Completion-in-Construction-of-Future-Aircraft-Carrier-John-F-Kennedy-CVN-79.html