The subject of the contract is the supply (all lots), delivery (all lots), unloading (all lots), installation (all lots), commissioning (all lots), maintenance (all lots), inspection (all lots), testing (all lots) and training (all lots) of machinery/equipment by the contractor of the following goods for the Final Stop Before Climbing the Ladder: Mantar Cultivation and Technology Commercialisation Center Project.
Supply of Final Stop Before Climbing the Ladder: Mantar Cultivation and Technology Commercialisation Center.
Version of 2020-06-08
IPA - Supply of Equipment for Final Stop Before Climbing the Ladder: Mantar Cultivation and Technology Commercialization Center
EuropeAid/140862/IH/SUP/TR
2.ProcedureOpen
3.Programme titleMulti-annual Operational Programme ‘Competitiveness and Innovation Sector’ for Community Assistance from the Instrument for Pre-Accession Assistance (IPA II) for the Socioeconomic and Regional Development Policy Area in Turkey.
4.FinancingIPA II budget item 22.02 03 02 of the General Budget of the EU and National Contribution.
5.Contracting authorityMinistry of Industry and Technology — DG for EU and Foreign Affairs — Directorate of EU Financial Programmes, (MoIT/ DoEUFP), Ankara/TURKEY
6.Contract descriptionThe subject of this contract is the supply, delivery, unloading, installation and commissioning of machinery (CNC tool machines, 3D Printers, Robotic equipment etc.) and computer software and licences for Mantar Cultivation and Technology Commercialization Center.
7.Indicative number and titles of lotsLot 1: metal machining and metrology equipment
Lot 2: sheet metal fabrication equipment
Lot 3: wood processing equipment
Lot 4: metal surface, air and heat processing equipment
Lot 5: additive manufacturing and processing equipment
Lot 6: robotic equipment
Lot 7: EDM equipment
8.Intended timing of publication of the contract noticeJuly 2020
9.Additional informationNot applicable
10.Legal basisRegulation (EU) No 236/2014 of the European Parliament and of the Council of 11 March 2014 laying down common rules and procedures for the implementation of the Union's instruments for financing external action and Regulation (EU) No 231/2014 of the European Parliament and of the Council of 11 March 2014 establishing an Instrument for Pre-Accession Assistance (IPA II). See Annex A2 of the practical guide.
Remarks: There must be a minimum period of 30 calendar days between the publication of this prior information notice and the publication of the corresponding contract notice.
No applications or requests for further information should be sent at this stage.