The list below gives an indication of the type of tasks that can be asked to be performed under this framework contract.

Each specific contract shall specify what tasks are required to be performed by the supplier.

A. Evaluation of remote handling design concepts and solutions including but not limited to the following:

— field equipment including sensor systems, hydraulic and electromechanical actuators, viewing systems, optical systems, metrology systems, cabling and connectors, control systems, etc.;

— feasibility, reliability, availability, remote maintenance, decontamination, inspectability, operability and safety assessment'

— verification of Protection Important Components (definition of PIC related verification activities are in (AD-02) of Annex A to the framework contract);

— evaluation of requirements management and verification activities;

B. Review or production of technical documentation for remote handling systems and components including but not limited to the following:

— CAD models, drawings and schematics, technical specifications, safety evaluations, manufacturing sheets, calculations, analysis reports (operational, risk, integrated logistics or safety and hazard analysis), finite element analyses, etc.;

— review meetings;

— on-site inspections at the ITER site or supplier premises;

C. Execution of support activities including but not limited to the following:

— studies related to design, manufacturing or assembly of remote handling equipment (as described in point a above) and their respective rescue systems, complemented by tests on procured mock-ups and/or components;

— studies, development, integration and validation of software and hardware components of the remote handling control system;

— assessment/qualification within the nuclear engineering field of radiation tolerance of components, materials and systems related to confinement of, and shielding from radioactive sources.

Extended TitleEngineering Services in the Area of Remote Handling
Extended Description

The list below gives an indication of the type of tasks that can be asked to be performed under this framework contract.

Each specific contract shall specify what tasks are required to be performed by the supplier.

A. Evaluation of remote handling design concepts and solutions including but not limited to the following:

— field equipment including sensor systems, hydraulic and electromechanical actuators, viewing systems, optical systems, metrology systems, cabling and connectors, control systems, etc.;

— feasibility, reliability, availability, remote maintenance, decontamination, inspectability, operability and safety assessment'

— verification of Protection Important Components (definition of PIC related verification activities are in (AD-02) of Annex A to the framework contract);

— evaluation of requirements management and verification activities;

B. Review or production of technical documentation for remote handling systems and components including but not limited to the following:

— CAD models, drawings and schematics, technical specifications, safety evaluations, manufacturing sheets, calculations, analysis reports (operational, risk, integrated logistics or safety and hazard analysis), finite element analyses, etc.;

— review meetings;

— on-site inspections at the ITER site or supplier premises;

C. Execution of support activities including but not limited to the following:

— studies related to design, manufacturing or assembly of remote handling equipment (as described in point a above) and their respective rescue systems, complemented by tests on procured mock-ups and/or components;

— studies, development, integration and validation of software and hardware components of the remote handling control system;

— assessment/qualification within the nuclear engineering field of radiation tolerance of components, materials and systems related to confinement of, and shielding from radioactive sources.

Modifications

The list below gives an indication of the type of tasks that can be asked to be performed under this framework contract.

Each specific contract shall specify what tasks are required to be performed by the supplier.

A. Evaluation of remote handling design concepts and solutions including but not limited to the following:

— field equipment including sensor systems, hydraulic and electromechanical actuators, viewing systems, optical systems, metrology systems, cabling and connectors, control systems, etc.;

— feasibility, reliability, availability, remote maintenance, decontamination, inspectability, operability and safety assessment;

— verification of Protection Important Components (definition of PIC related verification activities are in (AD-02) of Annex A to the framework contract);

— evaluation of requirements management and verification activities;

B. Review or production of technical documentation for remote handling systems and components including but not limited to the following:

— CAD models, drawings and schematics, technical specifications, safety evaluations, manufacturing sheets, calculations, analysis reports (operational, risk, integrated logistics or safety and hazard analysis), finite element analyses, etc.;

— review meetings;

— on-site inspections at the ITER site or supplier premises;

C. Execution of support activities including but not limited to the following:

— studies related to design, manufacturing or assembly of remote handling equipment (as described in point a above) and their respective rescue systems, complemented by tests on procured mock-ups and/or components;

— studies, development, integration and validation of software and hardware components of the remote handling control system;

— assessment/qualification within the nuclear engineering field of radiation tolerance of components, materials and systems related to confinement of, and shielding from radioactive sources.

Deadline DateNone Provided
Publication Date2021-12-06
CountrySpain
Procurement StatusAmended
TypeOpen procedure
Contract TypeServices
Award CriteriaNot applicable
OrganisationEuropean Joint Undertaking for ITER and the Development of Fusion Energy (F4E)
Attention OfCommercial Management and Procurement Unit, for the attention of Mr Niels Van de Ven
AddressC/ Josep Pla 2, Torres Diagonal Litoral, Edificio B3, Office 10/23
TownBarcelona
Postal Code08019
Phone+34 933201800
Class Code71300000
Class DescriptionEngineering services
SourceOffice for Official Publications of the European Communities - Tenders electronic daily (Ted)

Related Procurements

Deadline: Feb 14, 2022
The contract is for the maintenance for the radio frequency power system of the linear IFMIF prototype accelerator part of the IFMIF/EVEDA project and for the magnet power supply system...
View more
Deadline: Feb 25, 2022
Ejecución de las obras de urbanización del Área de Intervención F-52/1 del Plan General de Ordenación Urbana de Zaragoza según Proyecto de Urbanización aprobado definitivamente el 23 de noviembre de...
View more
Deadline: Mar 11, 2022
El objeto del contrato consiste en la ejecución de las obras para la prolongación de la línea 11 de Metro de Madrid desde la estación de Plaza Elíptica hasta la...
View more