Task order 04 covers phase 1 of the final design of the Toroidal system, of the cassette locking tools, as well as risk reduction activities through the implementation of prototyping and tests in the area of pipe cutting maintenance tools and deployment functions performed by the manipulator.
Task order 04 covers phase 1 of the final design of the Toroidal system, of the cassette locking tools, as well as risk reduction activities through the implementation of prototyping and tests in the area of pipe cutting maintenance tools and deployment functions performed by the manipulator.
Task order 04 covers phase 1 of the final design of the Toroidal system, of the cassette locking tools, as well as risk reduction activities through the implementation of prototyping and tests in the area of pipe cutting maintenance tools and deployment functions performed by the manipulator.
This amendment adds activities related to the ongoing (final) design for the Divertor Remote Handling System (DRHS) and rearranges the deliverables in the different ADPs that are currently still to be delivered. Although the activities subject of this amendment were not included at signature of the specific contract, they have become necessary. As the additional activities are strongly interlinked with ongoing (design) work/services a change of contractor is not feasible for economic and technical reasons and would cause significant inconvenience and substantial duplication of costs.