The scope of the procurement is design and construction of tunnelling works for single bored double-track Tunnel No 4 (tunnel tube length L=3 275 m), evacuation tunnels (length L=310 m + 255 m + 815 m) and access roads ‘P3’ (length L=286 m) and ‘P4’ (length L=1 445 m).

The works will be implemented under FIDIC Conditions of contract for plant and design – build (Yellow Book, First Edition – 1999).

Extended TitleTunnelling and Civil Works for Tunnel No 4 on Stalac-Djunis Railway Section
Extended Description

Scope of the procurement includes design-build activities for tunnelling and civil works for Tunnel No 4, three evacuation tunnels and two access roads on Belgrade-Nis railway line, Stalac-Djunis Section, and will be consisted (but not limited to) the following main activities:

— preparation of design documentation in accordance with the Serbian regulations;

— tunnelling and construction of the single bored double-track Tunnel No 4 with three evacuation tunnels and two access roads;

— construction of the tunnel using the NATM design and construction method;

— the scope of the Works includes all necessary tunnelling and civil works, but not track superstructure, electrification, signaling and telecommunication.

Deadline Date2021-09-28
Publication Date2021-07-30
CountrySerbia
Procurement StatusActive
TypeOpen procedure
Contract TypeWorks
Award CriteriaLowest price
Value40000000.00
OrganisationJoint stock company for public railway infrastructure management: ‘Serbian Railways Infrastructure’ JSC
Attention OfMr. Sasa Zlatkovic
AddressNemanjina 6, 11000 Belgrade, Serbia
TownBelgrade
Postal Code11000
Phone+381 113621192
Class Code45221247
Class DescriptionTunnelling works
SourceOffice for Official Publications of the European Communities - Tenders electronic daily (Ted)

Version of 2021-06-04

Railway construction works

Reconstruction and modernization of existing railway line and construction of the second track railway Belgrade — Nis, section Stalac — Dunis implemented in accordance with FIDIC Contract Conditions for ‘Plant and Design-Build’ (‘Yellow Book’).

Extended TitleReconstruction and Modernization of Existing Railway Line and Construction of the Second Track Railway Belgrade — Nis, Section Stalac — Dunis
Extended Description

Scope of the procurement includes design-build activities for tunnelling and civil works for Tunnel number 4 on Stalac-Dunis section. The total length of the tunnel no 4 is 3275 m and will be consisted (but not limited to) of the following main activities:

— preparation of design documentation in accordance with the Serbian regulations,

— tunnelling and construction of the new single tube, double-track rail tunnel located on the 182+325.00 km of the Belgrade-Nis railway line,

— construction of the tunnel using the NATM design and construction method,

— construction of the three Emergency Exit shafts with two exist points on each side of the railway,

— the scope of works includes all the necessary tunnelling and civil works, but not electrification, signalling and telecommunication which are part of Lot 2.

Publication Date2021-06-04
CountrySerbia
Procurement StatusFuture
TypeNot applicable
Contract TypeWorks
Award CriteriaNot applicable
OrganisationJoint stock company for public railway infrastructure management: “Serbian Railways Infrastructure” JSC
Attention OfSasa Zlatkovic
TownBelgrade
Postal Code11000
Phone+381 113621192
Class Code45234100
Class DescriptionRailway construction works
SourceOffice for Official Publications of the European Communities - Tenders electronic daily (Ted)

Related Procurements

Deadline: Nov 1, 2021
The overall objective of this assignment is the detailed design, development and maintenance of the Transport Observatory Database/Information System (TODIS). TODIS shall be comprising various data from all South East...
View more
Deadline: Sep 28, 2021
The purpose of this contract is the procurement of missing machines and equipment needed for successful and valid performance of experiments related to the examination of varieties. Also, a part...
View more
Deadline: Oct 6, 2021
Execution of works of heavy maintenance (upgrading) of the state road IB 21, on section: Ivanjica - Sjenica, from 288+208.650 to km 309+123.689 in the length of 20.915 km.
View more