The contracting authority intends to enter into a contract with the successful economic operator(s) for multi-elemental improvement works to 102 Flats at Kings Road, Tullycarnet Flats. Multi-elemental improvement works comprise of complete external façade upgrade, refurbishment of 102 flats including alterations to 34 units to provide ‘active elderly’ accommodation, re-design of waste disposal, clothes drying provision and improvements to common entrances and stairwells. There are a total of 102 No dwellings in the scheme spread across a series of two separate complexes. The west complex, Granton Park, comprises eight interconnected blocks and the smaller east complex, Kinross Avenue, comprises six interconnected blocks. All blocks comprise three floor levels. Both complexes were built in 1967.
Version of 2021-01-08
Building construction work
The contracting authority intends to enter into a contract with the successful economic operator(s) for multi-elemental improvement works to 102 Flats at Kings Road, Tullycarnet Flats. Multi-elemental improvement works comprise of complete external façade upgrade, refurbishment of 102 flats including alterations to 34 units to provide ‘active elderly’ accommodation, re-design of waste disposal, clothes drying provision and improvements to common entrances and stairwells. There are a total of 102 no. dwellings in the scheme spread across a series of 2 separate complexes. The west complex, Granton Park, comprises 8 interconnected blocks and the smaller east complex, Kinross Avenue, comprises 6 interconnected blocks. All blocks comprise 3 floor levels. Both complexes were built in 1967.
Version of 2020-12-18
Building construction work
The contracting authority intends to enter into a contract with the successful economic operator(s) for multi-elemental improvement works to 102 Flats at Kings Road, Tullycarnet Flats. Multi-elemental improvement works comprise of complete external façade upgrade, refurbishment of 102 flats including alterations to 34 units to provide ‘active elderly’ accommodation, re-design of waste disposal, clothes drying provision and improvements to common entrances and stairwells. There are a total of 102 No dwellings in the scheme spread across a series of 2 separate complexes. The west complex, Granton Park, comprises 8 interconnected blocks and the smaller east complex, Kinross Avenue, comprises 6 interconnected blocks. All blocks comprise 3 floor levels. Both complexes were built in 1967.
The contracting authority intends to enter into a contract with the successful economic operator(s) for multi-elemental improvement works to 102 Flats at Kings Road, Tullycarnet Flats. Multi-elemental improvement works comprise of complete external façade upgrade, refurbishment of 102 flats including alterations to 34 units to provide ‘active elderly’ accommodation, re-design of waste disposal, clothes drying provision and improvements to common entrances and stairwells. There are a total of 102 No dwellings in the scheme spread across a series of 2 separate complexes. The west complex, Granton Park, comprises 8 interconnected blocks and the smaller east complex, Kinross Avenue, comprises 6 interconnected blocks. All blocks comprise 3 floor levels. Both complexes were built in 1967.