This contract will include design, and Construction of one phase (out of 3) of the WWTP (80,000) fot Kutaisi. incl. Precommisioning and Commissioning, and 12 months of operation and maintenance /DNP including training of the Employer’s staff
Version of 2023-02-03
Wastewater treatment plant construction work
This contract will include design, and Construction of one phase (out of 3) of the WWTP (80,000) fot Kutaisi. incl. Precommisioning and Commissioning, and 12 months of operation and maintenance /DNP including training of the Employer’s staff
Two stage procurement: First stage PQ of the contractors and second stage procurement of the design and construction works.
The main works to be carried out are as follows:
The works will be implemented under FIDIC Conditions of Contract for Plant & Design-Build for Electrical & Mechanical Plant & for Building & Engineering Works Designed by the Contractor (“Yellow book”) Second edition 2017.
The main works to be carried out are as follows:
- Detailed Design and Approval Period incl. Mobilisation: Design of a 240,000 People Equivalent (PE) Wastewater Treatment Plant with an average flow rate of 36,000 m3/d for a phased implementation. The WWTP shall include a mechanical and biological WW treatment plus a complete sludge line for anaerobic treatment a biogas usage. The Contractor shall design the complete WWTP and prove that an extension of the WWTP in 2 to 3 phases is possible while maintaining the operability of existing phase(s) and the respecting the permitted effluent standards. The WWTP further includes the effluent pipeline to the river and connection pipe to the principal intake manhole.
- Construction of one phase (out of 3) of the WWTP (80,000). incl. Precommisioning and Commissioning
- 12 months of operation and maintenance /DNP including training of the Employer’s staff