Lot 1 - Buchanan
32 km of 33 kV distribution lines on concrete poles; 85.5 km of low voltage 0.4 kV reticulation (ABC), including street lighting, on concrete poles; 55 pcs of pole-mounted distribution transformer stations 33/0.4 (0.23) kV, 12,054 new service connections.
Lot 2 – Greenville
65 km of 33 kV distribution lines on concrete poles; 30 km of low voltage 0.4 kV reticulation (ABC), including street lighting, on concrete poles; 25 pcs of pole-mounted distribution transformer stations 33/0.4 (0.23) kV; 4,344 new service connections.
Construction of the Distribution Networks in Buchanan Liberia
Version of 2023-09-11
Construction work
Lot 1 - Buchanan
32 km of 33 kV distribution lines on concrete poles; 85.5 km of low voltage 0.4 kV reticulation (ABC), including street lighting, on concrete poles; 55 pcs of pole-mounted distribution transformer stations 33/0.4 (0.23) kV, 12,054 new service connections.
Lot 2 – Greenville
65 km of 33 kV distribution lines on concrete poles; 30 km of low voltage 0.4 kV reticulation (ABC), including street lighting, on concrete poles; 25 pcs of pole-mounted distribution transformer stations 33/0.4 (0.23) kV; 4,344 new service connections.
Construction of the Transmission and Distribution Networks in Buchanan Liberia