This notice supplements previously published notices from Achilles Information AS regarding the contracting
entities mentioned in section I) and VI.2)'s use of the Utilities NCE qualification system that Achilles administer. Further, this notice supplements previously published notices from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o.
This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates specifically to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’). Entities represented by Ørsted Wind Power A/S might use the UNCE qualification system for procurement of construction works, services and goods for construction, operation and
repairs of wind farms. This notice relates to construction works.
UNCE qualification system can be used for all categories of contracts relevant for the wind farms. Without limiting the Entities represented by Ørsted Wind Power A/S legal rights to use UNCE qualification system for other types of contracts, such contracts includes but not limited to the cables, turbines, foundations including secondary structures, electrical systems, installation vessels, accommodation vessels, supply ships, helicopter services, substations, SCADA systems, communication systems, repairs including main components,
spare parts, consultancy services related to wind farms, IT systems, engineering services, certification services. Further, all types of administrative services inclusive but not limited to procurement services, legal services, accounting services and goods relevant for the group functions can be purchased through the UNCE qualification system. This also includes but is not limited to IT services, management consultancy, facility management, auditing, travel and accommodation.
Entities represented by Ørsted Wind Power A/S will carry out tenders in UNCE qualification systems and encourages any interested suppliers to register in UNCE qualification system. The contracting entities reserves the right to carry out tender procedures by other means i.e. by use of more specific qualification systems published by contracting entities or by use of contract notices in TED.
The CPV-codes referred to in this notice are examples of the works, services and goods that can be purchased through UNCE. These CPV-codes apply in parallel to the CPV-codes stated in previous notices from Achilles and the contracting entities.
This notice supplements previously published notices from Achilles Information AS regarding the contracting
entities mentioned in section I) and VI.2)'s use of the Utilities NCE qualification system that Achilles administer. Further, this notice supplements previously published notices from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o.
This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates specifically to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’). Entities represented by Ørsted Wind Power A/S might use the UNCE qualification system for procurement of construction works, services and goods for construction, operation and
repairs of wind farms. This notice relates to construction works.
UNCE qualification system can be used for all categories of contracts relevant for the wind farms. Without limiting the Entities represented by Ørsted Wind Power A/S legal rights to use UNCE qualification system for other types of contracts, such contracts includes but not limited to the cables, turbines, foundations including secondary structures, electrical systems, installation vessels, accommodation vessels, supply ships, helicopter services, substations, SCADA systems, communication systems, repairs including main components,
spare parts, consultancy services related to wind farms, IT systems, engineering services, certification services. Further, all types of administrative services inclusive but not limited to procurement services, legal services, accounting services and goods relevant for the group functions can be purchased through the UNCE qualification system. This also includes but is not limited to IT services, management consultancy, facility management, auditing, travel and accommodation.
Entities represented by Ørsted Wind Power A/S will carry out tenders in UNCE qualification systems and encourages any interested suppliers to register in UNCE qualification system. The contracting entities reserves the right to carry out tender procedures by other means i.e. by use of more specific qualification systems published by contracting entities or by use of contract notices in TED.
The CPV-codes referred to in this notice are examples of the works, services and goods that can be purchased through UNCE. These CPV-codes apply in parallel to the CPV-codes stated in previous notices from Achilles and the contracting entities.
Version of 2022-07-06
Construction work
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o. 2021/S 131-348959 (Works). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for Landfall Horizontal Directional Drilling (HDD) and Transition Joint Bay (TJB).
This notice supplements the CPV Codes included for 2021/S 131-348959 (Works) (and one for 2021/S 131-349308 (Services)), as these CPV codes has proven relevant for future tender procedures, specifically to the tender for Horizontal Directional Drilling (HDD) and Transition Joint Bay (TJB).
Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system as early as of week 34 using product code "4.3.10 Trenchless Pipe Laying".
Only companies registered in the specified product code at the time when the Prequalification Notice is issued can apply for the prequalification. If you intend to participate as a Consortium, please note that the Consortium or all participating entities should be registered in the abovementioned product codes.
The Scope of Work for the tender under the UNCE qualification system will be for Landfall Horizontal Directional Drill (HDD) and Transition Joint Bay project for both Baltica 02 and Baltica 03.
The scope consists of all activities necessary to complete the construction of 3 x HDD for Baltica 03 and 4 x HDD for Baltica 02. Comprising of a single HDPE duct for each HDD. It is envisaged that the HDPE Ducts will be 1000m each of 900mm HDPE SDR11. The scope will also include for the construction of total 7 Transition Joint Bays (3 for Baltica 03 & 4 for Baltica 02). Inclusive of concrete chambers to facilitate Fibre Optic Cable Jointing, Link Box chambers and the installation of an earthing Matt to allow the system to be connected at a later date by a different scope.
The HDPE Ducts will facilitate the subsequent installation of export cables between the Offshore Wind Farm and the onshore grid network. The cable installation scope is undertaken under a separate contract and is not part of this tender.
The landfall site is located within the Village of Lubiatowo, on the northern coast of the Pomerania Voivodeship, approximately 20km East of Leba and 50km North-West of Gdynia. Contract Award will expectedly be Q2 2023. Pre-Commencement Activities will take place at the Site, which will be available for selected Contractor from Q4 2024. The expected installation year is respectively 2024-25 for Baltica 03 and 2025 for Baltica 02.
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o. 2021/S 131-348959 (Works). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for Landfall Horizontal Directional Drilling (HDD) and Transition Joint Bay (TJB).
This notice supplements the CPV Codes included for 2021/S 131-348959 (Works) (and one for 2021/S 131-349308 (Services)), as these CPV codes has proven relevant for future tender procedures, specifically to the tender for Horizontal Directional Drilling (HDD) and Transition Joint Bay (TJB).
Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system as early as of week 34 using product code "4.3.10 Trenchless Pipe Laying".
Only companies registered in the specified product code at the time when the Prequalification Notice is issued can apply for the prequalification. If you intend to participate as a Consortium, please note that the Consortium or all participating entities should be registered in the abovementioned product codes.
The Scope of Work for the tender under the UNCE qualification system will be for Landfall Horizontal Directional Drill (HDD) and Transition Joint Bay project for both Baltica 02 and Baltica 03.
The scope consists of all activities necessary to complete the construction of 3 x HDD for Baltica 03 and 4 x HDD for Baltica 02. Comprising of a single HDPE duct for each HDD. It is envisaged that the HDPE Ducts will be 1000m each of 900mm HDPE SDR11. The scope will also include for the construction of total 7 Transition Joint Bays (3 for Baltica 03 & 4 for Baltica 02). Inclusive of concrete chambers to facilitate Fibre Optic Cable Jointing, Link Box chambers and the installation of an earthing Matt to allow the system to be connected at a later date by a different scope.
The HDPE Ducts will facilitate the subsequent installation of export cables between the Offshore Wind Farm and the onshore grid network. The cable installation scope is undertaken under a separate contract and is not part of this tender.
The landfall site is located within the Village of Lubiatowo, on the northern coast of the Pomerania Voivodeship, approximately 20km East of Leba and 50km North-West of Gdynia. Contract Award will expectedly be Q2 2023. Pre-Commencement Activities will take place at the Site, which will be available for selected Contractor from Q4 2024. The expected installation year is respectively 2024-25 for Baltica 03 and 2025 for Baltica 02.
Version of 2022-06-21
Substation construction work
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2021/S 131-348959.
This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entity project for the development, construction and operation of offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the Contracting Entity in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for the delivery of four offshore substation topsides and module support frames (MSF) under an EPC contracting model for the Baltica 02 (4 Topsides and 4 MSFs) .
Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system on July, 2022 using product code 4.5.14 - Substation Turnkey – Transmission.
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2021/S 131-348959.
This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entity project for the development, construction and operation of offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the Contracting Entity in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for the delivery of four offshore substation topsides and module support frames (MSF) under an EPC contracting model for the Baltica 02 (4 Topsides and 4 MSFs) .
Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system on July, 2022 using product code 4.5.14 - Substation Turnkey – Transmission.
Version of 2022-01-10
Construction work
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o. 2021/S 131-348959 (Works). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for Transport and Installation of Foundations and Offshore Substations.
Ørsted Wind Power A/S will use the Achilles Utilities NCE qualification system for procurement and expects to commence the tender in week 3 - 5, 2022, using product codes 2.8.6 Transportation Services, key word "Sea Transport Services" and 4.4.23 Wind Farm Construction, key word "Wind Farm Construction - Offshore Installation".
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o. 2021/S 131-348959 (Works). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for Transport and Installation of Foundations and Offshore Substations.
Ørsted Wind Power A/S will use the Achilles Utilities NCE qualification system for procurement and expects to commence the tender in week 3 - 5, 2022, using product codes 2.8.6 Transportation Services, key word "Sea Transport Services" and 4.4.23 Wind Farm Construction, key word "Wind Farm Construction - Offshore Installation".
Version of 2022-01-10
Construction work
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o.), 2021/S 131-348959 (Works) . This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for " Transport and Installation of Offshore Export and Array Cables".
Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in week 13 2022, using product codes 4.2.16.
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o.), 2021/S 131-348959 (Works) . This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for " Transport and Installation of Offshore Export and Array Cables".
Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in week 13 2022, using product codes 4.2.16.
Version of 2021-11-24
Construction work
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o. 2021/S 131-348959 (Works). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for Manufacture and Supply of Monopiles.
Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in week 48, 49 or 50 using product codes 4.4.23.
This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o. 2021/S 131-348959 (Works). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures.
This notice relates to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for Manufacture and Supply of Monopiles.
Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in week 48, 49 or 50 using product codes 4.4.23.